We would like to inform you that all construction and installation works are underway!
As of May 10, 2024, the following works have been completed:

  • Monolithic works fully completed, roofing installed, masonry work on external, inter-apartment, and interior walls finished.

  • Glazing completed 100%.

  • Screed installation works finished.

  • Plastering works of MZK completed.

  • Installation of heating, water, and sewage pipes in progress.

  • Electrical wiring works ongoing.

  • Fire protection system works in progress.

  • Installation of technical metal doors in MZK and technical rooms ongoing.

  • Acoustic insulation of technical rooms against noise ongoing.

  • Ventilated facade installation works ongoing; one section completed.

  • Staircase railing installation works ongoing.

  • Installation of aluminum metal structures in non-residential premises on the 1st and 2nd floors completed.