We would like to inform you that all construction and installation works are ongoing!
As of March 6, 2025, the following works have been completed:
Monolithic works fully completed, roofing installed, masonry work on external, inter-apartment, and interior walls finished.
Glazing completed 100%.
Screed installation works finished.
Plastering works of MZK completed.
Installation of heating, water, and sewage pipes done.
Electrical wiring works ongoing.
Apartment radiators installed.
Fire protection system works in progress.
Apartment doors installed.
Fire-rated technical doors installed.
Acoustic insulation of technical rooms against noise completed.
Installation of ventilated facade on two sections finished.
Staircase railing installation completed.
Finishing works in common areas underway (painting, floor tiling).
Lighting installation in common areas ongoing.
Tiling works on open terraces completed.
Pump station installation completed.
Installation of aluminum metal structures in non-residential premises on the 1st and 2nd floors finished.
External network installation for the complex underway.