✔️ The building’s structural work is fully complete
✔️ All window frames have been installed
✔️ Floor screeds have been poured in the apartments and the heating system has been installed
✔️ All internal utilities have been fully installed
✔️ Doors have been installed and soundproofing work has been completed
✔️ Facade work is in its final stages
✔️ Common areas and open terraces have been prepared
✔️ The building’s engineering infrastructure is ready for operation: boiler room,
electrical panel, and pumping equipment
✔️ Structures have been installed in the commercial spaces
✔️ Apartment number signs have been installed on the floors
✔️ Finishing work in the entrance area is nearing completion